火范文>英语词典>demolition翻译和用法

demolition

英 [ˌdeməˈlɪʃn]

美 [ˌdeməˈlɪʃn]

n.  (建筑物的)摧毁,拆毁,拆除

复数:demolitions 

TOEFLGREIELTS经济

BNC.7696 / COCA.10854

柯林斯词典

  • N-VAR (建筑物的)摧毁,拆毁,拆除
    Thedemolitionof a building is the act of deliberately destroying it, often in order to build something else in its place.
    1. The project required the total demolition of the old bridge...
      该项目要求将老桥完全拆毁。
    2. The High Court has granted permission for the demolition work to continue.
      高等法院批准拆除工作继续进行。
  • N-UNCOUNT (体育运动等中的)大败,击溃
    Thedemolitionof a team or opponent is their defeat by a great amount.
    1. ...Lazio's impressive 3-1 demolition of Inter Milan.
      拉齐奥队以 3 比 1 大比分击败国际米兰队

英英释义

noun

  • the act of demolishing
    1. an event (or the result of an event) that completely destroys something
        Synonym:destructionwipeout

      双语例句

      • Spillover damage from the building's demolition was confined to some broken glass.
        拆除这座大楼带来的损失仅仅是一些玻璃被震碎了。
      • Invincible Demolition Trucks Build five or six Demolition Trucks and have a fully charged Iron Curtain ready.
        不能征服的破坏交易建立五或六个破坏卡车并且有一完全预先指控了铁帐。
      • The post-blasting investigation of the effect of blasting indicated that the demolition blasting of the cofferdam was successful.
        爆破效果调查表明,此次围堰拆除爆破是成功的。
      • Croft and a sergeant from the pioneer and demolition platoon stepped up.
        克洛夫特和工兵爆破排的一个士官走了出来。
      • These are two true stories of the demolition.
        这是两个真实故事的拆卸。
      • The demolition process of a16th floor building in Harbin was monitored, and vibration velocity and frequency of ground particles were obtained during the blasting and collapsing process.
        对哈尔滨市一幢16层楼房的爆破拆除过程进行了现场监测,获得了爆破和楼房倒塌过程中引起的地面质点的振动速度、频率等数据。
      • The project practice has proved this system used in the design of frame construction building demolition blasting is novel;
        工程实践表明,该系统用于框架结构楼房拆除爆破的设计,方法新颖;
      • The demolition of the chimneys shall be carried out only after these recommended mitigation measures have been fully implemented.
        拆卸烟囱的工程必须在这些建议缓解措施全部实施后才可进行。
      • Concentration of shaft kiln blasting demolition, blasting program to be a reasonable choice and the necessary safety precautions.
        立窑的大规模集中爆破拆除,须进行爆破方案的合理选择和必要的安全防护措施。
      • Demolition work is already underway on the site.
        工地上的拆毁工作已经在进行。