modifications
英 [ˌmɒdɪfɪˈkeɪʃənz]
美 [ˌmɑdəfəˈkeɪʃənz]
n. 修改; 改进; 改变
modification的复数
柯林斯词典
- VERB 修改;变更;改进
If youmodifysomething, you change it slightly, usually in order to improve it.- The club members did agree to modify their recruitment policy...
俱乐部成员的确同意修改吸纳新成员的政策。 - The plane was a modified version of the C-130.
这种飞机是C-130的改进机型。
- The club members did agree to modify their recruitment policy...
- VERB 修饰;限定
A word or group of words thatmodifiesanother word describes or classifies something, or restricts the meaning of the word.- It is a rule of English that adjectives generally precede the noun they modify: we say 'a good cry', not 'a cry good'.
英语规定形容词通常放在其修饰的名词前:我们说 a good cry,不说 a cry good。
- It is a rule of English that adjectives generally precede the noun they modify: we say 'a good cry', not 'a cry good'.
双语例句
- Improvements and bug fixes applied to the framework can benefit applications that use it& without modifications or recompiling.
应用于框架的改进和错误修复可以为使用该框架的应用程序带来好处&无需修改或重新编译。 - This required modifications to both task and task-instance classes provided by jBPM.
这就要求修改jBPM提供的任务和任务实例类。 - Other fixes and Rom adjustments and Registry Modifications.
其他修复和罗马的调整和修改注册表。 - I think there may have to be additional modifications, but for now, they are working.
我认为有可能需要额外的修改,但现在,他们的工作。 - This unit has since transferred to WAGN, and has received cab modifications.
这个单位后来转移WAGN,和接受了小室修改。 - We have a comprehensive database of all the latest and greatest modifications to your car.
我们有一个全面的数据库中的所有最新和最伟大的修改你的车。 - After some modifications in grouting parameters and several improvements in technology, the satisfactory grouting effect is obtained finally.
通过对注浆参数的修改和注浆工艺的改进,获得了理想的注浆效果。 - Two modifications have been made.
这里做了两处修改。 - Modifications are made to the syntax tree using a combination of constructors and the ReplaceNode method.
变更是针对语法树做出的,变更时会使用了构造器和ReplaceNode方法的组合。 - This leads to time-consuming maintenance and code modifications and not being able to accurately forecast time and costs.
这导致维护和代码修改工作非常耗时,并且无法准确预测时间和成本。