火范文>英语词典>overburden翻译和用法

overburden

英 [ˌəʊvəˈbɜːdn]

美 [ˌoʊvərˈbɜːrdn]

v.  使负担过重

过去分词:overburdened 过去式:overburdened 现在分词:overburdening 第三人称单数:overburdens 

TOEFL经济

BNC.20075 / COCA.20715

牛津词典

    verb

    • 使负担过重
      to give sb/sth more work, worry, etc. than they can deal with

      英英释义

      noun

      • an excessive burden
          Synonym:overload
        1. the surface soil that must be moved away to get at coal seams and mineral deposits

          verb

          • burden with too much work or responsibility
            1. load with excessive weight

              双语例句

              • This paper summarizes the new freezing technology used in construction of the auxiliary shaft of Longgu Colliery in thick overburden.
                本文总结了龙固副井的冻结施工工艺,为巨野煤田以及深厚表土的冻结施工提供了经验和技术保证。
              • Dynamic Analysis of Asphalt Concrete Core Rockfill Dams on Deep Overburden
                深覆盖层上沥青混凝土心墙堆石坝动力分析
              • Stability analysis of loose surrounding rock with shallow overburden by a discretization finite element method
                一种浅埋松散围岩稳定性离散化有限元分析方法探讨
              • Application of the Technology of Dynamic Monitoring by Network Parallel Electrical Method in Overburden Failure
                网络并行电法在覆岩破坏动态监测中的应用
              • The method of culvert-undercutting with shallow overburden is adopted to construct Beijing Xisihuan underground culvert of South-to-north Transfer Project.
                南水北调北京西四环暗涵施工中采用了浅埋暗涵施工法。
              • Application of radioisotope logging technique to the testing of the coefficient of permeability in the overburden layers of riverbed
                放射性同位素测井技术在河床覆盖层渗透系数测试中的应用
              • Of the pressures, the one caused by the weight of overlying sediments, we call it overburden pressure, is the most obvious.
                在这两种压力之中,由上覆沉积物重量造成的压力最为明显,我们称这种压力为上覆压力。
              • Study on Debris Flow Forming Reasons in Overburden Layer During Transition Mining from Open Pit Mine to Underground Mine The oil workers drilled down another 10 feet to find oil.
                露天转地下开采覆盖层形成泥石流原因的研究在地下打洞石油工人为了开采石油又往下钻了10英尺。
              • The process of ore-drawing in block caving is completed under overburden.
                自然崩落法放矿基本上都是在覆盖岩层下进行的。
              • Numerical Analysis for Influence of Anti-seepage Measure of Deep Overburden Foundation on Seepage Field
                深覆盖层地基防渗措施对渗流场影响数值分析